Google has signed a deal with California startup Kairos Power for six or seven small modular reactors. The first is due in 2030 and the rest by 2035, for a total of 500 megawatts. [Google blog; pre…
one argument in favour of SMRs i’ve seen is that while less efficient than regular sized reactors, these are cheaper per unit (but not for MW) so some of them can be built earlier than bigger reactors. which doesn’t matter because these things don’t exist
square-cube law is in full force there
one argument in favour of SMRs i’ve seen is that while less efficient than regular sized reactors, these are cheaper per unit (but not for MW) so some of them can be built earlier than bigger reactors. which doesn’t matter because these things don’t exist