• Captain Aggravated@sh.itjust.works
    link
    fedilink
    English
    arrow-up
    1
    ·
    11 months ago
    1. I thought it had been longer than that since we commissioned a nuclear power plant, and
    2. Does one every eight years or so feel like a decent rate for building these things?
    • Goodie@lemmy.world
      link
      fedilink
      English
      arrow-up
      1
      ·
      11 months ago

      That’s the engineering knowledge lost over the last 30 years costed out.

      Making 2 reactors since 95 has some side effects, a lot of the senior engineers since then have retired, standards have changed, and new engineers need to learn.